l
76
your olycation to this vitally
422
portazil work be
ނ
t work being
undertakin une
ice to me as the
without reference
designet of the.
ret of the new works;
also, as act
arrd
acting Consulting bi
sulting Engineer
throughout the progress of the works, up to the present time. I
must also express my extreme surprise that the di
durveyor
General should have taken this
Courel, ad
he clearly.
from me,
that a
understood
properdistri
bution of the water was.
wasonly. second importance to the establishment of the main works. And that in
zee o
conseguen of the peculiarities
of the site of the City of Victoria, in
which there are.
irregularities of
surface
surface, wide variations in
gradients, all.
ll of which nez
elevation, connected with.
steep
the
sury
and
grading
ign
greatest care in
zoning.
the water-mains so as to secure a
peroper
head of pressure for domes
tic service.
giving.
ared sa.
catra
a fe
tra pressure, whene
required for there
have Towns in Cove
service We
of
brigland, whose
the head of water is as
as various as a b
great and Hong Kong and
the most modem experience
gained in England, both for the
Water Mains and fo
for House
::fillings, ought to be made avail-
able for Hong Kong.
me
V
the
Dublin
9 On the completion of t
No comments yet.
Private notes are available after approval.